Industrial Insulation Standard

Table of contents

CINI 10.1.00 | 2014-10-01
LNG / CRYOGENIC THERMAL INSULATION
List of participants10.1.01
General requirements for the thermal insulation of "cryogenic" piping and equipment10.2.01
Contraction joints10.2.02
Layering of cold /cryogenic insulation10.2.10
Contraction bellows in cryogenic systems10.2.11
Installation of HD-PIR / HD-PUR pipe supports10.2.12
Inspection and Test Plan (ITP)10.2.13
 
INSULATION/FINISHING DETAILS FOR CRYOGENIC INSULATION
Pipe sliding supports multi-layer10.5.01
Pipe sliding support multi-layer connection with pipe insulation system10.5.02
Section of rundown line between intermediate anchors - slide through systems 10.5.03
Pre-insulation of pipe length, Section A – slide through system10.5.04
Section field weld - On-site insulation connection pre-insulated pipe lenghts10.5.05
Pre-insulation of pipe length, Section B – slide through system10.5.06
Longitudinal section of rundown line and primary guide10.5.07
Pre-insulation of pipe length – s

Read more >

To read the full article you have to buy a license for the online manual, with this license you have acces to the manual for one year.