Industrial Insulation Standard

Installation of HD-PIR / HD-PUR pipe supports

CINI 10.2.12 | 2010-06-01

Note: The installation of cold/cryogenic insulation supports should be a combined effort between the Mechanical Contractor and the Insulation Contractor.

This specification describes the materials and the application of prefabricated pipe supports.


Read more >

To read the full article you have to buy a license for the online manual, with this license you have acces to the manual for one year.