Industrial Insulation Standard

Painting systems for temperature range (ICC) -165°C ... 400°C (-265°F ... 750°F)

CINI 7.4.05 | 2016-01-01

The construction supervisor/principal shall ensure that, prior to start the surface preparation, rough welds and sharp edges are dressed with a minimum radius of 2 mm (ref. ISO 8501-3, grade P3) and all weld spatter is removed.

Prior to surface preparation, all oil and grease shall be removed by means of alkaline cleaning, emulsion cleaning, high pressure cleaning or other approved methods. (SSPC-SP1)


Read more >

To read the full article you have to buy a license for the online manual, with this license you have acces to the manual for one year.